MOULD FILLING
The art of filling the cheese mould
The mould filling equipment is primarily designed to deliver a certain amount of curd to a mould and hence to produce cheeses, after pressing, of roughly the same weight. Such equipment could be incorporated either as a part of the curd handling system or in a position dependent on the variety of cheese produced.
The traditional wheel shaped cheese – The Emmental
The entire curd content from each vat is delivered to a mould after e-wheying , and the cheese maker has to alter the volume of the milk used in order to overcome the effect of seasonal variation on yield. Thus producing the cheese of roughly the same weight.
Cheddar and related varieties
The sequence of filling the salted, curd chips in to moulds is given below
- Tare of weight of mould
- First stage filling – up to 70% or more of the final weight of the cheese is delivered in to the mould
- Pre press the curd
- Second stage filling of the mould to the desired weight e.g. 20 kg and
- Transfer cheese moulds to the press
While the discharged door is in the closed position, a horizontal guillotine cuts the curd and an ejector-ram pushes out the block and gives the curd a second pre press in the hoop. During the mould filling stroke, the mould liners are held in position by a clamp frame which also prevents the spillage of curd. The rate of filling is 3 x 20 Kg moulds per minute and the mould filing can be arranged either from the right hand or left hand side.
0 comments:
Post a Comment